Centralized cooling system, exhaust heat recovery

After electrical and gas incentives from Northeast Utilities, projected payback/ROI was just 2.57 years, with annual savings of $137,250 per year.

Project Description
NuWay was involved in a planned expansion to add a fourth production line and approached IMEC with a request to provide additional cooling to serve the new line. IMEC performed a comprehensive audit of the existing cooling system. The audit identified several potential areas of savings including the cooling towers, chillers, and heat recovery.

Project Photos:

IMEC Production Tank for NuWay

IMEC Precision Temperature Control for NuWay

IMEC Heat Recovery for NuWay

VIDEO: Learn more about this award-winning project for energy efficiency

IMEC engineered solutions provided the following benefits:

1. Reduce energy consumption of the cooling tower system by replacing the existing four cooling towers and pumping systems with a single two cell high efficiency tower and complementary duplex 40 HP VSD pumping skid, capable of handling the entire cooling load of the factory including the new expansion.

2. More precise temperature control was achieved by replacing the existing line spray system which utilized several pumps, tanks and manual controls with a custom designed tank, pump and valve assembly which delivered precise temperature and pressure for the cooling sprays. In addition to reducing horsepower and energy a consistent temperature and pressure yielded higher quality product with less scrap.

3. Energy savings in the chilled water portion of the process was achieved by replacing the existing air cooled 50 ton reciprocating chiller with a York high efficiency, water cooled, 60 ton screw chiller. Condenser cooling was handled with the new central cooling tower. The existing chiller tank which utilized both a chiller pump and loop pump was replaced with a duplex variable speed drive pumping skid utilizing a single pump to handle the chilled water process.

4. The new paper line continuously flows 20,000 CFM of outside air over the product. The air is split between the rear and front sections of the line and is heated to approximately 160°F. After treating the product the air is exhausted to the outside. IMEC designed and built heat exchangers and installed them on the roof at the two inlet and discharge ducts. The system was able to reclaim 80% of the exhaust heat and use it to preheat the inlet air.

Comments from Plant Engineer Rick Gendreau:

“When I first met with IMEC I was looking to have them provide additional cooling for our new line. IMEC looked at our entire system and proposed installing one large efficient tower for the whole plant, replacing our air cooled chiller with a more efficient water cooler chiller, designing a more efficient spray system for our lines, and installing heat recovery in our new line 4 process. They worked with Northeast Utilities to secure for us over $350,000 in utility rebates. The rebate and energy savings made spending the extra money a no brainer. The system has been everything they promised. The installation was smooth and on schedule. An added bonus is the improvement in our product quality. The hard work and cooperation of all parties is greatly appreciated.”